Learn · Articles

Facility Design & BOM

You have validated the case. Now the question gets concrete: what do you actually build, with which parts, and who builds it?

01 · What it includes

Designs, adaptation and bills of materials

That is what Manna's Facility Design & BOM answers — modular facility designs validated across 30+ countries and climate zones, so a customer does not reinvent the engineering or chase equipment specs from scratch.

What the designs cover:

  • Modular reference designs that scale with demand. Start with one unit, prove the business, then replicate the same module — from 0.5 to 5 to 10+ tonnes of biowaste per day. Capacity gets added from revenue, not from one large upfront loan.
  • Substrate- and climate-adapted. Insulation, ventilation and equipment sizing are tuned to the local conditions and the actual waste stream. A warm-climate greenhouse build and a cold-climate insulated container are not the same facility, and the design reflects that.
  • Validated bills of materials. Every component is specified, with sourcing links and qualified regional supplier networks behind them — 102+ vetted BSF and equipment suppliers.

02 · Sourcing and routes

Local sourcing and two delivery paths

Local sourcing is the default. The proprietary part of a Manna facility is the MIND control system and the operating knowledge — recipes, procedures, training — not the physical structure. Containers, panels, trays, shredders and sieves are built or bought where the customer already is, which keeps CAPEX low and avoids long import lead times. An entry climatised module lands around $8,500–$13,500 depending on local conditions; a full 5 t/d site can be built for under $250K total CAPEX.

Two ways to get there:

  • DIY with Manna support. The customer builds locally using Manna's designs, BOMs and supplier links, with remote support, training and on-site visits as needed. Lowest cost, highest local ownership.
  • Manna turnkey. Manna designs, sources and delivers the specified modules through vetted regional partners, and hands over a working, commissioned unit. Faster, less effort on the customer's side.

03 · The choice

Which path fits the customer

Both paths are equally valid. The right one depends on local build capability, timeline, and how much of the operational chain the customer wants to own.

Keep exploring

Related topics and pages

Read next

Next step

Design the facility and source it

Manna can take a validated case and turn it into a concrete facility design, a bill of materials and a sourcing plan.