Manna Insect

BSF fly on a lead | Locally produced insect protein | CAPEX in BSF business | Manna Insect

CAPEX in BSF production: What you actually pay for

Capital expenditure (CAPEX) is one of the most misunderstood parts of Black Soldier Fly (BSF) production. Many projects fail not because the technology is wrong, but because investment assumptions are incomplete or misallocated or – at worst – your business calculations are based on wishes rather than reality.

This article breaks down where CAPEX in BSF production really goes, what is essential, what is optional, and where over-investment most commonly happens.

CAPEX in BSF production is not “the farm” — it’s the system

A BSF production setup is not a single investment. It is a chain of capacities, and every weak link will cap your output.

Typical CAPEX categories include:
✔ Physical structure (production unit or building)
✔ Climate control
✔ Rearing infrastructure
✔ Harvest and separation equipment
✔ Processing and stabilization
✔ Utilities, basic automation, storage

Focusing investment on one part while underinvesting in others creates bottlenecks that no biological optimization can fix.

Structural CAPEX: smaller production units such as a container vs. a building

Container-based systems

Containers concentrate CAPEX into:
✔ Insulation and internal finishes
✔ Climate control equipment
✔ Rearing racks and trays

Advantages:
✔ Predictable costs
✔ Fast deployment
✔ Modular scaling
✔ Low CAPEX, but also lower output

Limitations:
✔ Limited internal volume
✔ External dependency for feedstock handling and processing
✔ High €/m³ efficiency requirements

Building-based facilities

Buildings shift CAPEX toward:
✔ Construction and utilities
✔ Internal logistics space
✔ Larger processing areas
✔ Automation and production lines

Advantages:
✔ Possibility to change space use case
✔ Easier capacity expansion if extra room within the facility, harder and more expensive if need to build new spaces.
✔ Integrated workflows

Risks:
✔ Overbuilding early
✔ Paying for unused space
✔ Underestimating fit-out costs

The structure itself rarely determines success — capacity alignment does.

Climate control: the silent CAPEX driver

Temperature and humidity control typically represent one of the largest single CAPEX items.

Common mistakes:
✔ Designing for peak conditions instead of average load
✔ Ignoring heat generated by larvae metabolism
✔ Undersizing air circulation and dehumidification
✔ Overengineered HVAC increases CAPEX and OPEX.
✔ Under-engineered HVAC increases batch risk and reduces effectivity.

Within small production units such as containers the need for climatization is easily calculated and fitted, whereas in bigger, more complex facilities the need for heavy HVAC is greater, the systems are significantly more expensive, and still can’t always be fitter into production changes or have over-capacity when production is not running with 100% capacity.

The goal is stability, not laboratory precision.

Rearing infrastructure: simple beats complex

High-tech rearing systems often look impressive — and underperform economically.

Effective BSF rearing infrastructure prioritizes:
✔ High usable volume
✔ Easy cleaning
✔ Fast inspection and access
✔ Low failure complexity

In early-stage production, robust simplicity beats automation. Complex systems amplify small errors and increase downtime when something goes wrong.

Harvest and processing: the most underestimated CAPEX in BSF production

Many BSF projects size rearing correctly — and undersize everything that comes after.

Harvest and processing CAPEX includes:
✔ Separation equipment
✔ Drying or stabilization systems
✔ Buffer storage
✔ Material handling (incl. packaging)

If these stages cannot handle 20–30% more volume than rearing, output will be capped regardless of biological performance. This is where many “high-capacity” farms quietly lose money.

Automation: ROI first, not aesthetics

Automation should reduce:
✔ Variability
✔ Downtime
✔ Operator error

Not:
✔ Impress investors
✔ Replace thinking
✔ Mask poor layout design
✔ Focus on building own IPR

Good early automation investments are:
✔ Environmental monitoring
✔ Basic alarms
✔ Simple data logging

Full automation makes sense only after stable production is proven and automation capital AND operational expenses exceed that of manual labor significantly and continuously.

A practical CAPEX rule of thumb

Before finalizing any BSF investment plan, ask:

Does every downstream step have more capacity than the step before it?

If not, CAPEX is misallocated.

Final thought

BSF production does not require extreme technology — it requires balanced investment.

Projects fail when CAPEX in BSF production is driven by:
✔ The desire to scale too fast
✔ Overconfidence in biology
✔ Underestimation of processing and logistics

Projects succeed when CAPEX is:
✔ Modular
✔ Capacity-aligned
✔ Designed for reality, not theory

In the next article, we’ll move from investment to operations and break down OPEX in BSF production and what actually drives €/kg output costs.

Learn more about BSF farming in the
Insect Farm Hub!

Manna Insect has launched a comprehensive insect farming platform designed for learning, managing, monitoring and networking. There are tons of free content about insect farming, as well as a lot of paid premium content, that dives even deeper in black soldier fly business.

Do you already follow us in LinkedIn? We share insights and news about insect farming and BSF business daily in Manna Insect LinkedIn page, come and join the discussion!

Read also:
Optimizing BSF frass processing: Techniques, equipment and value enhancement
Building a professional level BSF farm for under $10,000
Top 10 most viable BSF business cases for 2025-2026

Share this article: